Following careful examination of your
computerware, including the networks, we can report to
you fully on what needs to be done and when any remedial
action needs to be taken.
Report on items
requiring upgrade or replacement
Examine how compatible the hardware
and software items are with each other
The problem is a global issue and goes
beyond the date change problem on your PC(s). Embedded
microcontrollers in a variety of equipment from fax
machines, to flight systems and many more in between.
Follow these hyperlinks to see what
others are saying about the millenium problems.
Barclays Bank
Trust Group
What we do.
A fixed cost service per machine
(including monitor, modem printer/scanner), we perform a
series of tests per machine in two passes. Firstly the
machine is PAT tested to determine the electrical
condition of the equipment. Having passed this test, the
second pass will check bios, virus infection, operating
system and applications.
Bios Check. Diagnostic to determine whether the PC bios
will pass the date test and apply an appropriate fix.
Applications Check. Installed applications and operating system
checked against known list.
Virus check. Checked
against all known virus.
PAT Testing. Portable Appliance check. Check on
electrical condition for health and safety regulations.
Full Audit Report. Detailing
hardware, software, items passed, failed or unknown
software.
Additional Services
System Analysis. Further analysis to detail the suitability
of the PC hardware and software with a view to running
the next generation of operating systems and
applications. Detailing what items will need to be
addressed and what the likely cost will be. This service
is charged at our hourly rate, as the time taken to
complete the study is largely dependant upon the amount
of applications and the time taken into assessing likely
remedial costs.
IT Infrastructure Analysis. High
level study and analysis to assess the whole of the
companies IT Infrastructure. Resulting in a detailed plan
of the readiness of the whole IT system and identifying
what areas are to be addressed in order to achieve a more
robust corporate IT strategy. Perform a workflow study to
identify operational procedures and applications software
required in the process of achieving a robust IT system.
Further analysis to highlight what functions the end
users are trying to achieve and what additional
components within the new framework will be required in
achieving those goals.
Have you ever considered whether your
machine is actually fit to touch?
If you are one of the few
organisations that think about health and safety, you may
already have your computer systems PAT tested in line
with the Health And Safety At Work ACT etc1974 and all
associated legislation.
The PAT procedure is relatively quick
and can be performed on site with little or no
disruption. It involves connecting the equipment into a
specialist peice of test equipment which will run through
a set of automated diagnostic routines, logging the
results. A printout will then confirm the results showing
pass or fail in one or more of several categories.